Contenuto principale della pagina Menu di navigazione Modulo di ricerca su uniPi Modulo di ricerca su uniPi

Plan4RES

Plan4RES Logo

 

UNIPI Team Leader: Prof. Antonio Frangioni, Dip. di Informatica

 

Plan4RES is a collaborative research and innovation project which aims at developing an end-to-end planning tool to successfully increase the share of renewable energy into the European Energy system without compromising on system reliability. The targeted platform will account for the Pan-European interconnected electricity system, potential synergies with other energy systems, emerging technologies and flexibility resources, providing a fully integrated modelling environment.


Moving away from a monolithic approach will enable to overcome mathematical and computational challenges. The objective is to strive towards a system where a multiplicity of models, properly organized in a functional hierarchy, synergistically contribute to the analysis of such complex systems.

Targeting all main stakeholders of the power system, from generation to retail through grid operators, this innovative modelling platform will deliver a full system planning capability while considering a large set of future uncertainties, thus acting as a decision making tool for future investments. Allocation of multi-energy resources, system flexibility, assets portfolio assessment, advanced ancillary services or impact assessment of regulation are among the key features that the tool will deliver.


Three case studies will provide the necessary validation of the platform, showing the adequacy and relevance of the developed modelling framework, especially key advances included in Plan4Res (multi-energy integration, investment planning under uncertainties, TSO/DSO flexibility Cost integration…) and data base. Those studies, performed on a European scale, will also demonstrate the efficiency of the modelling and solving of the tool. Moreover, the case studies will demonstrate the benefit of using tailored versions of Plan4Res for various stakeholders: multi technology provider, TSO, utility or energy provider.

 

Coordinator
ELECTRICITE DE FRANCE (France)

Other participants

  • IMPERIAL COLLEGE OF SCIENCE TECHNOLOGY AND MEDICINE (United Kingdom)
  • SIEMENS AKTIENGESELLSCHAFT (Germany)
  • CRAY COMPUTER GMBH (Switzerland)
  • Konrad-Zuse-Zentrum für Informationstechnik Berlin (Germany)
  • RHEINISCH-WESTFAELISCHE TECHNISCHE HOCHSCHULE AACHEN (Germany)
  • CONSORZIO INTERUNIVERSITARIO PER L'OTTIMIZZAZIONE E LA RICERCA OPERATIVA (Italy)

Start date: 01-11-2017
End date: 31-10-2020
Duration: 36 months
Project cost: 3.905.060,00 euro
Project funding:  3.905.060,00 euro
Unipi quota: 324.393,75 euro
Call title: H2020-LCE-2017-SGS
Unipi role: Third party

Project website: https://www.plan4res.eu/

Ultima modifica: Ven 11 Gen 2019 - 08:37

Questo sito utilizza solo cookie tecnici, propri e di terze parti, per il corretto funzionamento delle pagine web e per il miglioramento dei servizi. Se vuoi saperne di più, consulta l'informativa